The Getty Museum is akin to a small city. Maintenance and alteration of the infrastructure of the campus requires a small army of facilities personnel, architects, engineers, and contractors. LRA is proud to have been a part of the museum's ongoing improvements, including expansion of their cold storage and upgrade of the network operations center.
The network operations center upgrades included replacement of the main server room’s uninterruptible power source (UPS). Phasing was designed into the replacement process to minimize downtime in this 24/7 facility.