The existing 14-story office building is being converted into market-rate apartments, while the existing adjacent parking structure will form the podium for 5-stories of new units, for a total of 275 total residences. The project will feature amenities such as a gym, pool, dog park, and pet wash.
Woodland Hills, CA– Laboratory – Interior renovations to planetarium, science building, cadaver room mechanical systems, and lecture halls. DSA jurisdiction.
Lewis Ross Associates provided complete MEP engineering for Quest Diagnostics Auto Chemistry laboratory expansion.
Los Angeles, CA, 301 apartment units, high-rise, mixed-use, restaurants on ground floor, fitness center, and rooftop pool deck. Design phase is currently underway.
Los Angeles, CA – 43-unit, 4 levels of apartments and roof deck on top of parking podium and one level subterranean parking.
68 unit – 2 levels subterranean parking, 4 levels of apartments and retail.
Los Angeles, CA 120 Units - Mixed-use, 6 levels of apartments, 2 levels of subterranean parking, Starbucks coffee shop, and space for more retail and food service to come.
Interior renovations for laser laboratory. Improvements included reconfiguration of mechanical systems and connection to base building hot and cold decks, ISO 7 cleanroom with terminal HEPA filtration, and laser operation annunciation.
LRA provides BIM services at any and all stages of construction to help owners, developers, and contractors realize these benefits.
The Los Angeles Police Federal Credit Union earned RACAIA Architecture + Interiors the 2022 Commercial Real Estate Gold Award. LRA is proud to have worked at RACAIA’s side on this gorgeous interior renovation.
300+ unit mixed-use. This exciting new development features over 300 apartment units, four levels of parking, restaurant, food hall, subterranean half-court basketball/pickleball and gym, pool deck, and landscaped courtyards.
Ongoing upgrades to the City’s fire departments for gender and ADA accommodations.
Improvements at the picturesque Victory and Desiderio Parks in Pasadena.
We are proud to have been a part of the ongoing improvements at the Los Angeles County Arboretum.
10,000 square foot recreation center with sports courts and activity rooms.
Interior renovations for microbiology laboratory. Improvements included laboratory gas distribution, workbench connections, and mechanical reconfiguration for new equipment layout.
The Jewish Family Services Gunther-Hirsh Family Center, Los Angeles is the organization’s flagship service center, located on Fairfax…
Lewis Ross Associates provided complete MEP engineering for Quest Diagnostics Auto Chemistry laboratory expansion
Lewis Ross has provided years of design, consulting, and advisement for the Kaiser Permanente, Glendale campus. Lewis Ross has provided MEP engineering for improvements to the facilities such as…
Adam Perry Lang Steakhouse, Napa. CA. Full-service high-end steakhouse with in-house dry-aging facilities.
Full MEP engineering for bakery, coffee roastery, and restaurant with commercial kitchen, full bar, dining room, and outdoor dining patio.
LRA provided fire alarm, mechanical, and electrical engineering for upgrades to this ten-story courthouse building. Design included complete addressable fire alarm system and control panel, stairwell pressurization retrofit, egress lighting, and exit signage.
High-rise renovations and fire alarm upgrades. Jury room renovations and fire alarm survey and report, approximately one million square feet within the scope of survey and design documents.
Currently in the construction documentation stage, the project features over 100 residences in seven buildings, arranged in multiple three-story buildings, distributed across a podium deck covering an above grade parking garage.
This cosmetic manufacturing tenant improvement in Southern California mixes, molds, packages, and ships cosmetic products all over the world.
Over 100,000 square feet, the Adept Fasteners headquarters features conditioned warehouse space, inspection areas, office space, emergency backup power, VRF systems, and digital lighting control system.
LRA is proud to be part of ongoing improvements at Kaiser Permanente’s North Hollywood campus. We have provided design and engineering services for…
Currently in the early stages of construction, LRA provided complete MEP engineering services on this condo development in Pasadena.
- ADA
- Adaptive Reuse
- Administration
- Aerospace
- Alteration
- Apartment
- Assembly
- assessment
- Audio
- AV
- award
- bakery
- bank
- BIM
- central battery
- Charter School
- Church
- Clash Detection
- clean room
- clinic
- coffee
- commercial
- Community
- Cosmetics
- courthouse
- credit union
- Critical Power
- DSA
- Dust Collection
- Education
- Electrical
- Factory
- Featured
- fire alarm
- Fire Department
- food
- Food Service
- gas
- generator
- Government
- healthcare
- hepa
- high-rise
- HVAC Upgrade
- Industrial
- interior Tenant Improvement
- ISO
- laboratory
- LADWP
- LEED
- Lighting Design
- Lighting Upgrade
- Long Beach
- Manufacturing
- medical
- Mixed-use
- multi
- Multi-Housing
- Municipal
- Museum
- Navisworks
- New Construction
- Office
- Parks
- Performing Arts
- Photovoltaic
- pool deck
- Private Residence
- Public
- PV
- Recreation
- renovation
- Residential
- restaurant
- Restaurant
- Retail
- Revit
- SCE
- School
- Service Upgrade
- Services
- Shell & Core
- Solar
- Stage
- stairwell pressurization
- Steakhouse
- Student Housing
- survey
- Tenant Improvement
- Underground Parking
- Uninterruptible Power Source
- Upgrade
- UPS
- Utility
- Variable Refrigerant Flow
- VRF
- Youth